Clinton River Spillway Bridge Open 05-20-2016

| May 20, 2016

The work on the Clinton River Spillway bridge finished right on schedule. Originally it was slated to be opened by May 20 and by one local report, the bridge was open to traffic on Tuesday, May 17th.

Cutoff Bridge Open 5-20-2016 c

There is an additional update about the conservation work being done around the bridge as well. For more on that see this video from Justin Clark: https://www.youtube.com/watch?v=2v0SrkseiEA

Tags: , , , ,

Category: Feature, Local

About the Author ()

Wayne Carpenter is the owner of Xtreme Bass Tackle and Combat Fishing, and author of No Secrets on Lake St. Clair.

Comments are closed.